News

US Army expands CSG's Iowa 155mm artillery plant to $741M

What's the deal? The US Army has added $105.8 million to Czechoslovak Group subsidiary MSM Group North America's contract for a new 155mm shell loading complex at the Iowa Army Ammunition Plant, raising the total value to $741 million. The modification, announced by the US Department of War in November 2026, keeps completion of the Future Artillery Complex on schedule for 10 August 2029.

Why it matters: The plant is designed to surge 155mm projectile production in wartime and drop back to a lower sustaining rate in peacetime without becoming uneconomical. CSG says the complex will be able to load up to 36,000 projectiles a month — about 432,000 a year — and MSM North America says the facility is being built to remain in service for 50 years. The expansion comes as the Pentagon pushes industry to speed up weapons output, with the Army budgeting for surge-capable artillery production as European demand for 155mm ammunition remains elevated.

Read more: Defence Blog

More top stories