Launch

SpaceX tells the FAA its outdated air traffic control caps 10,000 launches a year

What's the deal? SpaceX has told the Federal Aviation Administration that rocket production is no longer its main constraint — outdated air traffic control is. The company proposed dedicated launch corridors, faster approvals, and real-time flight tracking to coordinate rockets with airline traffic as it pushes toward higher launch rates.

Why now? SpaceX expects to conduct up to 10,000 launches annually, and the FAA projects US launches and re-entries will reach that figure by 2035. Chief executive officer Elon Musk has said SpaceX's planned Louisiana Starbase alone could handle 10,000 Starship launches a year.

What's the endgame? SpaceX wants dedicated corridors and better real-time coordination so launches and commercial flights can share increasingly crowded airspace. The company is targeting its first Starship launch from Louisiana.

The policy angle: The FAA is pursuing faster licensing, including a proposal to waive requirements under 13 environmental laws for some commercial-space approvals. But that addresses paperwork, not the coordination of rockets with airline traffic — the bottleneck SpaceX is flagging.

What's in the filing? SpaceX's 24-page comment, dated 26 October and signed by Mat Dunn, its vice president of government affairs, answers a DOT/FAA request for information on siting new spaceports and priority airspace for launch corridors (docket FAA-2026-9736). It says "SpaceX anticipates conducting 10,000 launches per year itself", against what it counts as 182 licensed US launches and 7 licensed reentries in calendar 2025, and that SpaceX's planned Starbase, Louisiana, spaceport "is designed for approximately 30 launches and reentries per day." It notes that airspace closures still average just over two hours per launch, while the FAA's own corridor concept expects a normal vertical launch window of less than three minutes.

The asks: For missions inside a corridor, SpaceX wants airspace priority, automatic airspace approval within 48 hours of a request and a waiver of airspace fees. It also wants the FAA to plug its Space Data Integrator and Cleared, SpaceX's own real-time launch-status and airspace platform, into traffic-flow tools. SpaceX says it provides Cleared and its API at no cost to most major US airlines. The filing also argues that Cape Canaveral's pads are underused: SpaceX flew 101 of the Cape's 109 missions in 2025 from two pads.

The airline view: Airlines for America, whose members include American, Delta, United, Southwest, FedEx and UPS, filed in the same docket on the same day. It says the FAA's forecast of a more than 460% rise to 10,000 launches a year by 2035 means members "anticipate serious impacts to their operations". It wants new spaceports vetted against their effect on existing airspace users and the full air traffic control modernisation delivered in parallel.

What could go wrong? The FAA recorded a US-record 204 commercial launch and re-entry operations in fiscal 2025, with SpaceX responsible for 161 of 195 licensed launches. Starship operations have already triggered safety concerns and flight disruptions when failures scattered debris over busy routes.

The signal: SpaceX's case shifts the regulatory debate from how fast launches get approved to whether airspace capacity and safety can keep pace. As one company dominates US launch volume, the question is no longer about rockets — it's about who controls the sky above them.

Read more: stocktwits.com

Sources: SpaceX comment (regulations.gov), Airlines for America comment (regulations.gov), @xdNiBoR on X

More top stories